Skip to playerSkip to main contentSkip to footer
  • 2 days ago
फॉरेस्ट फायर पर नियंत्रण के लिए बनाया गये 1430 क्रू स्टेशन, इंटीग्रेटेड सेंट्रल कमांड सेंटर से रखी जाएगी नजर

Category

🗞
News
Transcript
00:00Aang di keli, turan dhvambi bhagma, sujma diyan.
00:30I 획 deo il
00:44I am a aang di keli, turan dhvambi bhagma, sujma dikeli, turun dhvambi bhagma, sujma dikeli, turun dhvambi bhagma, suju, turun dhvambi bhagma, sujma dikeli.
00:51And in which way, the whole Raja Ji is doing monitoring here in the Uttarakhand,
00:58which are built from the command center,
01:03the Uttarakhand 1-bibhag and the Uttarakhand 1-bibhag,
01:06you can see the whole peak of the season,
01:11where the heat is rising, the heat is rising,
01:13the heat is rising up to 30 degrees in the last week.
01:16And at this time, when the Uttarakhand 1-bibhag is rising,
01:23we will talk about it.
01:25In this command center, Arun Chauhan Ji is here.
01:27He is a 1-bibhag, a forester.
01:30Arun Ji, what are you doing here?
01:34When there is a command here,
01:38and what are you doing here?
01:41Sir, now there is an integrated command center.
01:46The one-bibhag has been working on it.
01:48The one-bibhag has been working on it.
01:50The one-bibhag has been working on it.
01:52The one-bibhag has been working on it.
01:53You can tell me, I want to know that the screen is coming.
01:56How do you see it?
01:58The screen is mainly for fire alert.
02:02It is also in the entire area.
02:03So if there is an alert in the entire area,
02:08wherever there is fire fire damage,
02:09there will be alert here.
02:10So, there's a warning here.
02:11There's no warning here?
02:12Yes, there are no warning here.
02:13In the entire area,
02:14there are details,
02:16the range of the range.
02:18The alert has been coming here.
02:19Here, alert ID has come.
02:21state of the beat, which is the beat, division in Ramnagar,
02:26range, and then we contact the field staff.
02:32One is built in our control room in 1926.
02:36So, the health line number is installed here.
02:42And our caller is also sitting here 24 to 7 hours.
02:48All of your callers are sitting here.
02:50If we talk about it, then how do you feed it?
02:54As the call comes in 1926,
02:58we have a number of calls for wildlife.
03:03We have two set up for it.
03:05We have two set up for fire for it.
03:09If we have three numbers, then we have illegal fallings.
03:12Bricks pattern.
03:13If we have to cut it, we have to get rid of it.
03:16If we have to get rid of it, then we have to get rid of it.
03:21If we have to get rid of it, then we have to take the callers' details.
03:26Then we have to contact them, and then we have to get rid of it.
03:34How do you have alerts in these days today?
03:39Sir, because this season is the name of the fire season,
03:44we have to get rid of it in the name of the fire season.
03:47So, the main main concern is the fire.
03:50Now, the screen on the side, there is an analyzing report.
03:54There are four reports written.
03:58Come on, we have to get rid of it and then we have to get rid of it today.
04:10It will be closed and there will be two not-of-fire and there will be two not-of-fire and there will be two not-of-fire because the satellite will take up the data, so this is not-of-fire.
04:19We are consolidating the whole data.
04:22Now, we can see which division of the FITRAGAR, which is not-of-fire.
04:26There are two not-of-fire.
04:27There are two of them.
04:28There was one of the Ramnagar division, which was like this.
04:30And those who have been closed, they were the central division.
04:33So, you guys have called and called on that.
04:37We have the feedback from the field staff.
04:40We have the feedback from the FITRAGAR, which is the FITRAGAR division.
04:43We have the feedback from the FITRAGAR division.
04:45So, that will be closed or not.
04:46So, we can tell that the forest fire is being taken by the location of the FITRAGAR, which is being taken by action.
04:51This command center is being taken from the entire province.
04:54Besides, there is a lot of technical or technical development.
04:58How many years have been affected in the forest fire in the past few years?
05:02And what has been done in the last few years?
05:06How many years have been affected by the FITRAGAR division?
05:09This is the story of the FITRAGAR division of the FITRAGAR division of the FITRAGAR division of the FITRAGAR division of the FITRAGAR division.
05:13Now, the forest fire has been affected by the FITRAGAR division of the FITRAGAR division.
05:16This is a part of the FITRAGAR division of the FITRAGAR division.
05:18Let's hear it.
05:48and the alerts to attend and then they send us feedback reports.
05:52So, we are going to try to do that,
05:55because it is less than less.
05:57It is less than less response time.
06:00We can see it as soon as soon as we can attend.
06:02And we can see if it is in our jungle or in our area,
06:06we can see it accordingly action-taken reports.
06:09And the other thing,
06:11we have just done a work-run.
06:13We have just done a work-run program.
06:15After that,
06:18we have been done by October to October.
06:20We have been done with this project.
06:22And around 5078,
06:29we had been done in small pieces,
06:34we had been applied to our people for the last 10 years,
06:38and people,
06:40to connect to the community and community institutions,
06:45which is our model, the Mora One Prabhaag,
06:48we also tried to do other projects in other projects.
06:52We started the number from November,
06:57that we had an exposure visit,
06:5915 divisions,
07:02and the community institutions were there,
07:05and they were learning what they were doing.
07:07These are the ones that we are doing,
07:12these are the ones in other places.
07:15Now, there was also a place in the Kalji-Khal block,
07:18where there were 22 grams and 18 grams.
07:24There was also a place in other places,
07:28and there was also a place in the people,
07:31that they had to be able to get rid of them.
07:34It is very difficult for us to think about it and to keep it in the same way.
07:51In the past years, we have seen that some of the people who have seen the past few years
08:00Second, the alerts in every day, we have to generate reports and report every day.
08:09We have seen how many incidents, how many incidents are, how many incidents are, how many of us are doing.
08:15So, we have to do a monitoring of the monitoring.
08:19This is why we have integrated command and control center in our own one-muchhiale,
08:25where the alerts are doing.
08:28And, as we have said, our state plan has been unknown for the government.
08:33In all, the rules of the government, the government, the government and the government,
08:41the government, the government and the government,
08:47that we have provided the use of the environment for the field of DFOs to ensure the use of the compliance department.
08:56This time, one of the forest fires, has also made a MOU sign for the forest fire.
09:02What happens in this, let's listen to this.
09:05Look at the global warming, there is no particular temperature,
09:11but the average temperature.
09:13So, there is a water temperature.
09:15One is, when you talk about the global warming,
09:17you can see the temperature on the higher side of the normal.
09:23So, these things are reflected.
09:25So, I have said that if there is a prolonged period,
09:28then there is a place where the forest fires are.
09:31So, there are some things.
09:32And the forest fires, there is a problem in the summer.
09:35So, when the temperatures are higher,
09:38as you can see in the hills,
09:40when the 27-27 temperature will reach,
09:42you can see that the forest fires are increasing.
09:46So, this is the situation in May, generally it is made.
09:50But, if there is no activity in the morning,
09:53then it will also be made.
09:54So, this is the first time of May and June,
09:58the first time of May,
10:00the temperature is the highest period.
10:02And if there is no rainfall activity,
10:06then the forest fires are increasing in the forest fire.
10:09So, in the forest department,
10:12the forest fire is produced by the forest fire.
10:14In that, there is a customized forecast,
10:17the forecast being in the tower,
10:19which was the temperature of the forest fire.
10:20And, in the coming days,
10:21the forecast being low,
10:22that will be increasing.
10:23And in that, the extended range forecast is only 14 days.
10:25extended range forecast for 14 days, so in the next two weeks, what kind of temperature
10:30can be done?
10:31That's all.
10:32We can focus on this area that has reached thresholds or vulnerable areas, so we can
10:39have a man and machine that can be done.
10:43So these are all things, so this is one factor, and the other factor, if you look at the
10:50moisture level, the rainfall activity, if you look at the beach beach, if you look at
10:54We have seen some activity in the back of the river.
11:01We have seen some activity in the back of the river.
11:05The moisture level, rainfall activity,
11:09is a green area.
11:12The forest or firewall event is a break.
11:16But if we don't get activity,
11:19then we can see events.
11:22We have seen some events.
11:24The forest fire, the integrated command center,
11:33the fire line, the water supply,
11:36the MO sign,
11:38these are the work that we have done.
11:41This is the work that we have done.
11:44ETV,
11:46Dhehradun,
11:47Dheera Sajwan's report.

Recommended