• 3 months ago
(Adnkronos) - “La gamma Maximator Hydrogen ci permette di offrire sul mercato delle stazioni di rifornimento di idrogeno che sono in grado di garantire oggi quella affidabilità e quelle performance che le renderebbero già utilizzabili con un parco circolante di vetture e mezzi che speriamo possano nascere quanto prima”. Lo ha detto Matteo Riva, amministratore delegato Inox Riva e Maximator Italy a margine della terza edizione di Hydrogen Expo, il più grande appuntamento italiano interamente dedicato al comparto tecnologico per lo sviluppo della filiera dell’idrogeno, in svolgimento al Piacenza Expo dall’11 al 13 settembre 2024 e organizzata da Mediapoint & Exhibitions.

Category

🗞
News
Transcript
00:00The starting point is the components to control and convey fluids, it is the
00:11joinery and it is the joining system that led me about 15 years ago to
00:17get in touch with Maximator and from there we discovered that the range of
00:22Maximator products was much higher. We have many references in the
00:27automotive world and then the automotive has evolved and changed and the change has
00:35led to the issue of hydrogen and now we hope that it can become one of the
00:39alternative fuels used in the future. The solutions that we can
00:44propose on the market start from the small to then rise to the beginning of
00:50the use of hydrogen as an energy vector and therefore at the peak of
00:54the production of green hydrogen, the compression of hydrogen for a future
01:00reuse as a fluid to feed the fuel cells.
01:03Going up in level, going up as an application, you enter the world of mobility and there
01:11it becomes at this point important to be able to have key solutions in hand and
01:16the Maximator Hydrogen range allows us expressly to offer on the market
01:21of the refueling stations that are able to guarantee today that reliability and
01:29that performance that would make them already usable with a
01:35circulating fleet of cars and vehicles that we hope can be born as soon as possible.
01:40At this moment in Italy we are following six projects, the first is already in
01:46the executive phase, so just in these days we have concluded the part of
01:51acceptance test at the production in Nordhausen where there is the
01:55main headquarters of Maximator Hydrogen and the first modules have been
01:59delivered and are in the installation phase in the site, so the end of the
02:05project is scheduled, the last term is scheduled for February 2025 when the
02:12first five stations equipped with our technology will be available and
02:17will be open to the public.

Recommended